="p:domain_verify" content="4d86ef12f6af48bfbcc69a36d13421d0"/>
Courtesy of Synergy Realty Network, LLC.
New Build that is breaking ground and weather permitting will be finished in late June, early July 2024. Please for your safety, as they are building, do not walk around at the site without calling agent. This will be a ONE story with many upgrades including an enlarged garage and some other changes to the floorplan. The living room and master bedroom will have vaulted ceilings. the deck will be 10×22 feet and covered. There will be a tankless gas water heater. The flooring will be upgraded lvp and tile. Kitchen with quartz countertops.
Select the items on the page that you would like to print. This "Print Options" block will not be printed.
Main Photo | Main Details | Property Description | Property Features |
Additional Photos | Addtl Photos Size | Location Map | Schools |