="p:domain_verify" content="4d86ef12f6af48bfbcc69a36d13421d0"/>
Courtesy of The Godfrey Group, LLC.
A202 is the last remaining unit to be built in Revery Point! We have started construction and the estimated completion date is in May 2024. A202 offers 2 bedrooms and 3 full bathrooms with an additional flex room on the main floor. All of the main living is on the first floor with a second floor flex space, full bath, and guest bedroom, as well as attic storage space. Call today to secure this unit and become a resident of Revery Point in Foxland Harbor!
Select the items on the page that you would like to print. This "Print Options" block will not be printed.
Main Photo | Main Details | Property Description | Property Features |
Additional Photos | Addtl Photos Size | Location Map | Schools |